Project Overview
MPM Plumbing & Mechanical Services delivered a full mechanical and plumbing scope on a seven-floor residential building on Fulham Palace Road. The project encompassed the complete heating and water distribution across all floors together with the construction of a purpose-built energy centre plant room — showcasing MPM’s ability to deliver complex multi-system mechanical packages from energy centre to final distribution, fully commissioned and handed over.
About This Project
The Fulham Palace Road project required MPM to manage the complete mechanical scope across a seven-floor residential building, from first fix distribution right through to a fully operational energy centre. The plant room at the heart of the project comprises two 125kW modular boilers, a 1,000-litre buffer vessel and a boosted tank pump set — providing the capacity and resilience the building requires. MPM also installed the gas supply to the plant room using Viega’s stainless steel Sanpresssystem, and used Viega’s branch-in connector tool to incorporate pressure and temperature gauge pockets, maximising space efficiency and minimising the use of additional fittings.
All seven floors of heating distribution pipework were installed and pressure-tested using the Viega Megapress system, chosen for its speed, reliability and long-term performance credentials. The thermal insulation, BMS controls and fluing system completed the installation, with the BMS control panel connecting all mechanical systems into a single, managed building services infrastructure ready for handover.
The Fulham Palace Road project demonstrates MPM’s ability to deliver a full mechanical scope from energy centre to building-wide distribution — with the technical depth to specify and install premium product systems, the programme discipline to work across all seven floors without disruption, and the coordination capability to integrate pipework, controls, insulation and gas installation into a single, professionally managed contract.
MPM's Scope of Works
- Energy centre: 2 x 125kW modular boilers, 1,000L buffer vessel, boosted tank pump set
- Seven-floor heating distribution pipework — installed and pressure tested using Viega Megapress
- Domestic cold and hot water services
- Drainage — above and below ground
- Gas installation using Viega stainless steel Sanpress system
- BMS controls mechanical integration
- Full system testing, commissioning, and certification
Our work process
Quality We Ensure
If you are going to use a passage of Lorem Ipsum, you need to be sure there isn't.
Experienced Workers
If you are going to use a passage of Lorem Ipsum, you need to be sure there isn't.
Modern Equipment
If you are going to use a passage of Lorem Ipsum, you need to be sure there isn't.
Project Highlights
- Purpose-built energy centre: 2 x 125kW boilers, 1,000L buffer vessel, boosted pump set
- Seven-floor distribution fully installed and pressure tested using Viega Megapress
- Gas installed using Viega Sanpress stainless steel system with branch-in connector tool
- BMS controls integration, thermal insulation and fluing system completing the full installation